I haven’t been posting much…because I have been working a lot at my day job..and then working on the bathroom. So, having completed the 24th hour of this project, I have photos.

The peel and stick tile left so much sticky on floor that middle son says they were exfoliating to bottom of his feet. He laid down cardboard.

Removed the bottom of the drywall. You can see the subfloor.

Mostly this last day of bathroom work was less dramatic. Cleaning up the edges, the bottom, the mess.

2015-12-22 18.30.21

Subfloor at the head of the shower.

The peel and stick tile left so much sticky on floor that middle son says it was exfoliating the bottom of his feet. He laid down cardboard.

The peel and stick tile left so much sticky on floor that middle son says it was exfoliating the bottom of his feet. He laid down cardboard.

So then end of day 3 is not so dramatic as the end of the first 2 days.

And now the project is (mostly) on hold while my winter visitors are present. Next post: a HUGE decluttering project with middle son.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s